Need to provide 2 very stable sets of 1600KW engine synchronized parallel to form the required blackstart system, as well as a back-up emergency system. The back-up emergency system must respond instantaneously to ensure the whole power plant remains running.
The design of the engine, electrical and mechanical equipment must be able to withstand the extreme high on-site temperature.