Case Study

Case Study: Zhuhai

Fossil Power Diesel Genset
BP Zhuhai PTA2 Factory
ECP Contractor: China Huanqiu Contracting & Engineering Co., Ltd. & Technip

Owner:

BP Zhuhai Petrolchemical Limited

Capacity:

720KW

Output Voltage:

400V

Genset:

720KW @ 50Hz, 1500rpm

About the project

The Project adopts the world’s most advanced technology and reaches world-class levels both in environmental protection and in energy consumption. Compared with other PTA projects, the unit energy consumption is 40% lower, greenhouse gas emission 65% lower, liquid waste discharge 75% lower and solid waste discharge 40% lower, which not only saves the enterprise’s cost but assures its economic benefits and achieves energy saving and pollution reduction. This is the first time that BP adopted a strong localization strategy in China, i.e. localized design, localized procurement, and localized construction management. The Project’s successful completion and production also mark a huge success of BP’s localization strategy.

What we provided

  • 1 Kohler 720KW high-speed Diesel Generator Set. Assembled in Singapore.
  • Control Panels and ATS connection to the main grid.
  • Full documentation according to BP, Huanqiu, and Technip standards.
  • On-site training and service.

The Challenge

  • Highest oil and gas standard in this field of application.
  • Very high standard design diagram, graphics and documentation approval from BP, Huanqiu, and Technip.

Our Solutions

The diesel high-speed genset we provided must be compatible with the most dangerous and hazardous environment within regulations. Must guarantee that the genset produces zero sparks during ignition and operations. To provide the factory’s key components fail-safe, our genset solution provided the necessary back-up generator set for reliability and safety.

Gallery

If you have a question, we most likely have an answer!